The Cynwyd
Bala Cynwyd, PA
- Jobsite was challenging do to lack of laydown or staging area.
- Used the Trimble for laying out all pipe sleeves.
- Sleeve layout was critical and had minimal issues.
- Probably 98% of sleeves where on point.
- Rough in went well.
- Overall Project came better than expectations